by
George Pritchard , Mechanical Maintanance Engineer ( Hd. of the department. , Kabir Steel Ltd.
Basically, for erection work a crane is needed. the following items are needed, wooden blocks, wire slings, shackles, soft slings, hammer, crow bar, etc.