Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

Does the quantity surveyor need to design?

user-image
Question added by dana tutunji , Architect , Helou Trading Co
Date Posted: 2013/06/03
Sarah Elkanany
by Sarah Elkanany , Technical Office Engineer , RtX consultant

no , quantity survey always used after designing for estamiating amounts and cost

Christian Philip Silang
by Christian Philip Silang , Senior Estimator - Civil, Architectural & MEP (Tendering) , AlSaad General Contracting

Hi Dana, How are you? Hope everything is fine :-) Yes - in tendering stage, you should have knowledge in designing.
As per my experienced most BOQ from client are containing of Item/LS to be priced and to do so you need to design according to standard and project specification to have a budgetary price according to your design.
Hope my answer can help you.
Christian

SAMIH ABBAS KOTTACKAL
by SAMIH ABBAS KOTTACKAL , STRUCTURAL ENGINEER TRAINEE , CASE STRUCTURAL ENGINEERS

NO IT IS NOT REQUIRED BUT THE MAN IN CHARGE OF THE WORK SHOULD HAVE A SITE EXPERIENCE SO THAT HE COULD IDENTIFY FAULTY DESIGNS WHICH COULD BE HAZARDOUS.AS DESIGNERS ARE ALSO LIABLE FOR MISTAKES

Sonny Abad
by Sonny Abad , Quantity Surveyor/ Scheduler , Bineisa Group of Company

Not necessarily but we should know.
Forecasting is a designing.
Yes

Arshed Elfky
by Arshed Elfky , Tender Engineer (Pre-qualification & Proposal Engineer) , SHBC

No !!

Sherif Soltan
by Sherif Soltan , MEP Project Manager , Hassan Allam Technology

He/She should have a knowledge of how to execute the job , in order to realize the required materials missing in drawing or B.O.Q or project documents.

SAQIB ZAFAR
by SAQIB ZAFAR , Quantity Surveyor , PARSONS BRINCKERHOFF

Not necessary but he should aware about designing and detailling etc.
Saqib zafar Manager QS SYSTRA

More Questions Like This