Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

Do you accept to add water to concrete mix at site to improve slump, if you dont have admixtures? if you agree what is the limit and reference?

user-image
Question added by Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company
Date Posted: 2013/12/25
hassan amer ali algaifi
by hassan amer ali algaifi , مهندس مشروع , مؤسئسة علي الحصان للمقاولات

in fact,  adding extra water is a problem which leads to the formation of capillary pores which seriously affect the concrete strength and the concrete durability.

moreover, during  the doing mix design of concrete ,

1.DOE method can calculate water content for both wokabilty requirements and strength and durability needs.

2.we can add extra water for the absorbation of aggreaget.

so that  we have a totall water content in fresh concrete .

on site,

if there is any problem  regaring to slump as your a quesion, we can incearse water content untill reaching the totall water content which mention above.

when we reach the full water conent , it is not accepted to add water any more.

Wolf Klaas Kinsbergen
by Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

NO! never. The mixture wanted depends on the purpose , quality and desired strength. There are enough additives to make it workable, but think in front not at the site

Ahmad Omar Imran
by Ahmad Omar Imran , Site Manager , Aldiar International construction compan

it is not acceptable , but if the slump hard to much use water in ratio with cement20lt-1kg cement

Satheesh Kumar Martha
by Satheesh Kumar Martha , Site Engineer

No, I can't accept. It decrease strength and durability of concrete. Think before by analyzing site conditions and you may add some admixtures at the time of concrete manufacturing .

charles sebastian chalissery
by charles sebastian chalissery , Engineer (Structures) , Khalid BIn Ahmed & Sons LLC

It is not preferrable to add water after the design mix has been proposed. but in some cases due to difficulty in pumping the concrete it may be unavoidable. 

Note: try adding admix

water upto2%

More Questions Like This