Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the standard designing procedure to Design a Control Room? Can anyone help me to get details about it?

What should be distance between two rows of panels, How much illumination need to be provided, How to lay cable trays under the floor and other things.

user-image
Question added by Ankit Thummar , Instrumentation Engineer , Staple Fiber Division, Grasim Industries Ltd.
Date Posted: 2014/01/05
Nazar Pasha
by Nazar Pasha , Sr.Eng , SEC

The clearance between the rows of panel shall be2M and the illumination shall be100 lux.

The battery room shall be seperate from the battry chargers room.

The continuous loading of the batteries shall be12 Hrs and the cahrgers shall be capable to recharge the bateeries in12 Hrs in worst case.

Thank you

 

Ahmed Fawzy
by Ahmed Fawzy , Sr. I&C Engineer , Louis Berger

the distance be/w panels shall be enough for access and maintainace. the control cable shall be under floor

More Questions Like This