Register now or log in to join your professional community.
This is my question full Answer:
QC is the standard abbreviation for quality control. A QC job can include measuring whether existing products meet a set quality standards, planning how often sampling will be performed, determining the standards by which quality will be judged and/or establishing how products and processes will be improved to meet quality standards.
Description:
QC jobs primarily involve sampling, measuring and verifying that manufactured products meet pre-determined quality standards. These quality standards can include ISO (International Standards Organization) and ANSI (American National Standards Institute).
Types:
QC inspectors and testers measure existing products against the standards they are given. They often record information on non-conforming products. QC staff create Specification Control Charts based on the products they are sampling. Quality engineers monitor the Specification Control Charts to spot trends in the production line's output veering from the expected quality. They will create plans to improve product quality. They will identify causes for the out-of-spec product and then work to improve the product's quality. Industrial production managers determine the quality standards the production plant must meet.
Qualification:
Quality engineers have a bachelor's of science degree in engineering. Industrial production managers have at least a four-year degree in business, management or engineering. Many industrial production managers have a master's degree in business administration. Engineering technicians who work as QC inspectors, testers and samplers usually have an associate's degree in engineering technology.
Training:
QC technician and engineering degrees are only recognized if the two- or four-year degree is earned from a college or trade school accredited by the Technology Accreditation Commission of the Accreditation Board for Engineering and Technology (ABET). QC engineers may have passed the Fundamentals of Engineering exam or Professional Engineering exam, but this is not essential to the job.
Thanks you all for try to give my question answer!!!
QC (Quality Control) is controls stationed at regular places within the manufacturing process that checks the quality of the manufactured product at that point in the process. This control function may be automated or may be done by human QC inspectors. A typical human QC function would be an out of box audit performed on a percentage of finished manufactured product. A typical automated QC function would be a series of machine run diagnostics on a populated or non-populated printed circuit board.
QC Engineer is responsible for the adoption of the materials used in production, according to the specifications that have been identified and he is also responsible for the production stages to ensure that the final product meets specifications
Simple Quality Control for products, processes,systems,deliverables etc.....................
It’s to verify and monitor the specification of the service and/or the goods produced versus the planned requirement and judge if comply or not then reported to the concerned person. in some cases release and approve the produced qty
I worked as a QC Engineer in a Pharmaceutical Company. I made physical and chemical tests of tablets, capsules, ointment, syrup and suspension then I Measured assay and %release of active material by using spectrometer, HPLC and IR.
QC is application of the NDE on the product to assure it meets the required level of quality as per the code, specification / procedures.
QC aims identify to ensure the defect and rectified in the before stating the work ,during the work and after completion the work according to the project specification and international standards.product should be met client requirement look forward the continue imrovement.
Answer added by ,
A.Anbalagan
DSI
QC job includes all practices, procedures and records used to control the production line or the service provision before, during and final inspection and test with total coformance of client specifications, standard and ITP's with respect of HSE rules.In construction.All controls monitoring, witnessed or audited should be recorded, any deficiences shoul be registred, removed and corrected, preventive and corrective actions could be performed if necessary.