Register now or log in to join your professional community.
If a firm is more concerned with reliablity of data than with the speed at which data is available, which of the following costing methods would be the best fit? a. Variable (direct) costing b. Standard costing c. Normal costing d. Actual costing
Option A
Reliability wise marginal costing provides an in depth view of controllable and non controllable costs
d) Actual Costing
Actual costing..