Register now or log in to join your professional community.
Procurment method and selection fo the vendors for services and products
recycling of the waste - industry affliaction
reduction and reveiwing the last6 months variable cost
forecasting of intake and sales plan
marketing calendar for the the quarter and half year
the above when well define will reduce cost sizeable along with better utiliezation of the resources
Thanks Mr. Gautam.
Im also doing almost the same as u suggest. Simultaneously i've started material utilization & cut to ship also. Hope u have something related these two.
1. Consult the function heads to identify the crirtal control points in the operations which affect the effective utilization of resources and our profits.
2. Consult and develope the standard processes for same with the heads of the functions.
3. Develop the effective training mentods for execution.
4. Train members for the developed standard processes and measure the execution level.
5. Put them under simulation and retrain if, required.
Thank you.