What is Deming's Cycle used for is project management?

user-image
Question added by Ghada Sameer , Project Manager and media executive , CQA
Date Posted: 2014/05/04
Abdel Fattah Ibrahim
by Abdel Fattah Ibrahim , CDT Director , Colgate Palmolive

 

The Deming cycle or PDSA cycle:

PLAN: plan ahead for change. Analyze and predict the results.

DO: execute the plan, taking small steps in controlled circumstances.

STUDY: check, study the results.

ACT: take action to standardize or improve the process.