How is your negotiation method to the vendor if the work is Driven Piling Spun Pile?

user-image
Question added by Deleted user
Date Posted: 2014/05/20
Sachin Bhanudas Zende
by Sachin Bhanudas Zende , Senior Engineer Tendering & Estimation , Afcons In Infrastructure ltd

Depend on Type of Rig Available with Vendor, Resourcr avaiolabe with Vendor. Productivity of Rig and output