Ask the Community
Ask any professional question and get answers from other specialists.
Pre-commissioning equipment & system installation checking
The necessity is to complete everything according to engineering, so with the preparation of a punch-list we have a document of what's missing, what's wrong and ... See More
Obviously ,I would go for wall tiling first than floor tiling .If we prefer doing wall tiling later which would increase the chances of getting cracks on floor tiles at t ... See More
normally u should start by wall tiles without fixing the first row from below, then after finishing the flooring tiles , fix the first missing row above the floor tiles, ... See More
Definite wall because you have to put everything and also stand in washroom to fix the wall tiles, So if you put floor first, then applying wall tiles would definitely di ... See More
The Wall first , because the floor need to be treated at last, since we have to put insulation component.So the floor must come last so the isulation components wouldn ... See More