Trending Reservoir Management Discussions

Follow

Ask the Community


Ask any professional question and get answers from other specialists.

Stream language
abiola abiodun's image
Question added by abiola abiodun Intern, Petroleum Engineer (Reservoir Engineering/Production Engineer) NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED
10 years ago
Answers:
8
Followers:
Views:
333
Vote Count:
1
Answer should contain a minimum of 25 characters.
Bakenaz Zeidan's image
Question added by Bakenaz Zeidan Prof. of Dams and Water Resources Faculty of Engineering - Tanta University
10 years ago
Answers:
1
Followers:
Views:
121
Vote Count:
0
Answer should contain a minimum of 25 characters.
ANES FADEL ALI AL BABAA البعباع's image
Question added by ANES FADEL ALI AL BABAA البعباع
9 years ago

السلام عليكم، عند ايقاف انتاج في الحقل لفترة طويلة مع العلم انه هدا الحقل ينتج عن طريق مضخات، ما هي المشاكل التي يمكن ان يتعرض اليها المكمن؟ ‎

السلام عليكم , 1-عند ايقاف انتاج في الحقل لفترة طويلة مع علم انه هدا الحفل ينتج عن طريق مضخات ماهي المشاكل التي يمكن ان يتعرض اليها المكمن   2- خلال عملية انتاج في احد‎ ... See More

Answers:
0
Followers:
Views:
33
Vote Count:
0
Answer should contain a minimum of 25 characters.
Hesham Saied's image  
Answer added by  Hesham Saied, Senior Reservoir Engineer , Petronas (GPOC JV.)
8 years ago

to measure formation pressure to be interpreted to get fluids gradient to get fluid contacts and also give indication for mobilites.

Default profile image  
Answer added by  Deleted user
8 years ago

RFT allows us to determine several important reservoir parameters, which include; • Identifying the fluid contact(s)  • Determining the pressure gradients of the fluids w ... See More

Amr Elsayed's image  
Answer added by  Amr Elsayed, Reservoir Engineer. Management, AbuQir Petroleum Co. (Edison International JV)
8 years ago

1- To Identify the following: a-Reservoir Pressure, and Temperature b-Fluid Gradient and so the fluid Type c-Identify the contact (GOC - OWC - or GWC). 2- Have an essenti ... See More

Abdelrhman Ali's image  
Answer added by  Abdelrhman Ali, Production Engineer, Alamein Petroleum Company_EGPC
8 years ago

It provides essential information about the fluids contacts in the pay zone. This is essential to reasonably determine the accurate perforation depth to avoid early conin ... See More

TAREK GANAT's image  
Answer added by  TAREK GANAT, senior reservoir spcialest , petronas
8 years ago

- To determine reservoir pressure - defined top and bottom of layer/layer - to get PVT samples  

masoud soltani's image  
Answer added by  masoud soltani, Instructor/Professor, university
8 years ago

reservoir consists 1-rock properties 2-fluid properties so      Formation properties to determine the density and porosity-permeability formations can choose the ... See More