A. The baseline is frozen for the duration of the project and no scope changes are permitted B. The low levels of the work breakdown structure are known with certaint ... See More
A. Scope verification.B. Scope planning.C. Scope definitionD. Scope reporting.
EFFECT FO CHLORIDE CONTENT; EFFECT OF IRON CONTENT; IMPACT OF PH VALUES; CONDUCTIVITY; OIL CONCENTRATION
B. Iterative planning technique in which the work to be accomplished in the near term is planned in detail, while the work in the future is planned at a higher level. ... See More
A. The baseline is frozen for the duration of the project and no scope changes are permitted