Question added by Nader Ali Technical office manager AlSafwa Contracting
8 years ago
Answers:
14
Followers:
Views:
4966
Vote Count:
3
Answer should contain a minimum of 25 characters.
Nader Ali's image
Question added by Nader Ali Technical office manager AlSafwa Contracting
8 years ago
Answers:
11
Followers:
Views:
2694
Vote Count:
1
Answer should contain a minimum of 25 characters.
yousry farag's image
Question added by yousry farag Project Manager CEG
10 years ago
Answers:
2
Followers:
Views:
112
Vote Count:
0
Answer should contain a minimum of 25 characters.
Faraz Ahmed's image  
Answer added by  Faraz Ahmed, Project Manager, Sparrows
8 years ago

The following will determine the correct crane position: 1. Position should allow sufficient crane capacity at project perimeters 2. Position should create air rights / o ... See More

Imran Ahmed's image  
Answer added by  Imran Ahmed, Manager-Planning & Delay Analyst, Nesma United Industries (NUI) Saudi Arabia
8 years ago

The lifting capacity of Tower crane depends on various factors. The limitation for lifting weight starts from the base of the tower crane. Each and every component of the ... See More

FELIX DARAMOLA's image  
Answer added by  FELIX DARAMOLA, SENIOR HEALTH AND SAFETY ENGINEER, KHATIB & ALAMI CONSOLIDATED ENGINEERING
8 years ago

Every tower crane has it's own safe load capacity,so based on the safe load capacity you will be able to determine if the tower crane is safe to carry the load or no ... See More

Per Larsen's image  
Answer added by  Per Larsen
7 years ago

The torque of the tower crane tells you how much the cranes can lift depending on how far out of the crane arm it is. One must be very careful about the wind and the burd ... See More

Nader Ali's image  
Answer added by  Nader Ali, Technical office manager, AlSafwa Contracting
8 years ago

1- It should be place in a center area so it can serve the most of the project 2- you should put it in a place where you can easy dismantle it after finish the project 3- ... See More

John Sinaga's image  
Answer added by  John Sinaga, Crane Operator , Transocean, Shelf Drilling
7 years ago

No idea... I only drive offshore crane