Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
if we cant give required quality to consultant it will affect generally relation between QA/QC Engineer. So how to control that situation?
It will effect to the entire company not for the QA/QC Engineer it's dosegn matter? If we maintain the Approved work /Job procedures with out any deveations from claint or Third party inspectors that will auto matically Effect good relation ship inbetween Consultant & Contractors
The cordial relationship between the contractor and consultants can be maintained by :