Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

To keep production at maximum, in addition of raw material which spare part must available?

user-image
Question ajoutée par Rami Assaf , loading and Storage Operations Supervisor , Arab Potash Company
Date de publication: 2014/09/03
YASSIEN HUSSIEN
par YASSIEN HUSSIEN , General Manager , Alrowad Plastic pipes

Every machine has a specified schedule for maintenace if respected and replaced in the right time you can run the machine in max efficiency but care that the maximum o/p of the machine can obtained in some special conditions like type of recommended raw materials and the utilization of machine capacity

samer maher
par samer maher , Senior Operations Manager , El Badry

I support Mr.Yassin in his answer