Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
it is deppended time of tripping-rate of peneteratin-rate per minute driling-cost of rig and cost of bit.
I agree with Mr. Malik answer
Work in progress in always calculated on the %age of completion, it cannot be associated with time. Holding level is in terms of construction, loans are granted on some critieria, for example,40% on Base level, the2nd instalment will be on hold, unless the base is completed,20% on Walls before the construction of Roof and like that.
Cost of production
Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?