Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

Which of the following is the best strategy for limiting production delays caused by equipment breakdown and repair ?

<p style="text-align:left;"><span>Schedule production based on capacity planning</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span>  </span></span><span>Plan maintenance activity based on an analysis of equipment repair work orders</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span>  </span></span><span>Preauthorize equipment maintenance and overtime pay</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span>  </span></span><span>Establish a preventive maintenance program for all production equipment</span><span>.</span><span> -</span></p>

user-image
Question ajoutée par Utilisateur supprimé
Date de publication: 2014/10/01
georgei assi
par georgei assi , مدير حسابات , المجموعة السورية

The correct answer Establish a preventive maintenance program for all production equipment. -

Ibtisam Haider Syed
par Ibtisam Haider Syed , General Accountant , DAR AL AQAR REAL ESTATE LLC

A preventive maintenance program will reduce equipment breakdowns and repairs

Asim Azaldeen Abdalrahman Mhammed
par Asim Azaldeen Abdalrahman Mhammed , Property Manager , TAAM PROPERTY

I agree with the last answer establish ....

Ahmed Sobh
par Ahmed Sobh , Senior mechanical maintenance engineer , AlJAZIRA for steel coating

Apply preventive maintenance techniqe and analyze the problem by root cause analysis

Abdallah Abu Zeyad CMA
par Abdallah Abu Zeyad CMA , Finance Account Manager , Toyota - Abdul Latif Jameel Motors - KSA

Establish a preventive maintenance program for all production equipment.

 

I am Always with this method the preventive before the breakdown accur to avoid any problem.

Utilisateur supprimé
par Utilisateur supprimé

Establish a preventive maintenance program for all production equipment  - is the answer

because

A preventive maintenance program will reduce equipment breakdowns and repairs

cesario Jr gajetes
par cesario Jr gajetes , Technician , Qatar Cool District Cooling

Establish maintenance program for all production equipment

More Questions Like This