Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
Vertical integration, which is merge a number of production units operating in several successive stages of production, and vertical integration is divided into two types: forward integration and backward integration.
The goal of forward integration is getting the market, while the backward integration aims to control the sources of raw materials.
i agree with Mr yakoub
AutoCAD uses the vertical integration program to enhance the architectural designing of3D objects. - The3D objects can include walls and other things that are associated with the data having intelligence and association with the simple objects like lines and circles. - The data is programmed such that it represents only the architectural products and the extracted files. - The information for the data and the actions on the like modifies and creates the relationship of an object. - It consists of the tools that allow the estimation and other objects related representation in the2D drawings. - The elevations and sections used as a3D architectural model specifies the standard calculations used in creating applications.
Manager , assistant director , consulting engineer .
Very sorry I have no information on the subject