Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

How much time your Manager Spent on CAD Software: Autocad, SolidWorks, CATIA, or any other tool?

<p>Ex:1. Daily upto2-3 Hrs; remaining for client &amp; vendor meetings;              </p> <p>            repsonding to emails etc</p> <p> </p> <p>       2.He just guides &amp; do correction, not using the software at all.</p> <p> </p> <p>       3. He is using full time along with the team.</p> <p> </p>

user-image
Question ajoutée par Eby Mathai , Engineering Manager , KeM Engineering Services LLC
Date de publication: 2014/10/30
gowrishankar ganesan
par gowrishankar ganesan , service engineer , shahig company

he just check and correct process 

georgei assi
par georgei assi , مدير حسابات , المجموعة السورية

       2.He just guides & do correction, not using the software at all.

 

Raja Khader Mohideen R
par Raja Khader Mohideen R , Design Engineer , Autoone Engineering Services Pvt. Ltd.

He verifies the final drawing alone

SAFREENA NASRIN
par SAFREENA NASRIN , Architectural Draftsman , Establishment: Design Attitude

He spent the for checking the CAD file

Muhammad Shakeel
par Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

He Just check and Guide us, remaining of Time he attend the meetings with clients and vendor also. some of the days he spent whole the day using software to preparing the new design and If there is some needs to achieve the targets he is helping us and also giving Moral supports.

Agosh Kumar
par Agosh Kumar , Sr. Executive. Engineer , Ashok Leyland Bhandar

Most of the time my manger spend his time on outlook and approx he spent his 20% time on CAD software to check others work and to find a solution. 

karthik rethinam
par karthik rethinam , Design Engineer , Albilad Fire Fighting Systems Pvt Ltd.,

Our manager spent on every day 8 hours

4to 5 hrs spent on autocad and solid work

Mohammad Hasan
par Mohammad Hasan , LASER CNC OPERATOR , WORKSHOP

A little time .. because the design team is the one who spends a long time on these programs, but my manager at work checks only the files that have been designed

More Questions Like This