What are the consequences of Changes in a Design & Build contract? What are the various types of changes can be instructed in a Re-measure Contract?

user-image
Question ajoutée par GANESAN KANTHALU , Project Quantity Surveyor , MWH CONSULTING ENGINEERS (UK) LTD
Date de publication: 2014/11/19
Muhammad Usman Tariq
par Muhammad Usman Tariq , Visiting Faculty , National University of Science and Technology

Changes are always costly in terms of both time and money. Changes at design level cost almost25% of total cost of the project and50% at build level. It must be management in the analysis phase or pre feasibility phase. 