Why in driven piles, the allowable set is limited between 25mm and 50mm per 10 blows ?

user-image
Question ajoutée par جعفر هندي زين السقاف , "Certified trainer by the Yemeni Engineers Syndicate." , Engineers Syndicate
Date de publication: 2014/12/11
Utilisateur supprimé
par Utilisateur supprimé

 The max. limit of50mm/10 blows is established in the code principally to avoid very heavy hammer impacting at pile head so that the pile head may be damaged due to extra compressive stress

جعفر هندي زين السقاف
par جعفر هندي زين السقاف , "Certified trainer by the Yemeni Engineers Syndicate." , Engineers Syndicate

Agreed with Mr.Yaqoob's answer as well as Mr.Fouad's full answer, thanks.

فؤاد أحمد حسين
par فؤاد أحمد حسين , مدير , حكومي

Thank you my dear brother for your invitation ,,,,.  It is commonly to the limit pile set between25mm/10 blows and50mm/10 blows. In final set table . Because of the provision for lower limit of set value of25mm/10 blows is to avoid possible damage at pile toe owing to compressive stress reflected at the bottom of pile. The upper limit of 50mm/10 blows is established principally to avoid very heavy hammer impacting at pile head so that the pile head may be damaged owing to excessive compressive stress . These limitations are believed to be applied  originally to precast concrete piles.

hatem labib
par hatem labib , Quality control manager , MISER consultant

i agree with engineer Yaqop and Foaad

Alex Al Yazouri
par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

I agree with the experts, to avoid any possible damage caused by force or hammering. 

Omair Abduljaleel Ali Al-Quliey
par Omair Abduljaleel Ali Al-Quliey , Design Engineer , Quliey Office for constructions

Thank you for invitation:

there is no answer after our teachers En.Jafar, En.Fouad and En. Yaqob..

I support all answers of you.