According to the manufacturer preventive maintenance schedule, u have to build-up your sheat (PM performance Report). The columns will specify the various PM types like250 HR,500 HR,.. etc.
According to the manufacturer preventive maintenance schedule, u have to build-up your sheat (PM performance Report). The columns will specify the various PM types like250 HR,500 HR,.. etc.
Also the columns must include the daily meter reading which have to be updated and the due service, then we have to use a formula to compare between them in a separete columne which will be our reference if we soon due to make the service or already miss it. another column which is describe the performance of the job done in time within an acceptable factore of safety +/-20HRs.
maintenance is doing such machines,equipments working well without any problem in any given time,we can do some maintenance,daily,weekly,monthly or quarterly it depends with the equipments on what operation to use for.