As a project manager to ensure all work in the project is included?

 A. Create a contingency plan B. Create a risk management plan C. Create a WBS D. Create a scope statement

user-image
Question ajoutée par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
Date de publication: 2015/01/15
racha hamed
par racha hamed , Front Desk Receptionist , Kurban Travel Services

As a project Manager to ensure that all job is included in the project I should assert that there is a fair repartition of tasks among the group. Every person should handle a special criteria to ensure that all are participated in job . the right person in the right place and every one through his productivity and experience. This is how the circulation of work should be .

Basit Ali
par Basit Ali , Director of Engineering , Laverda Suites & Villas / Blue Bay Resorts

Option C

Vinod Jetley
par Vinod Jetley , Assistant General Manager , State Bank of India

 C. Create a WBS

 

is the correct answer.

Utilisateur supprimé
par Utilisateur supprimé

Creat a Wbs as my specialists said

Wolf Klaas Kinsbergen
par Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

It is called answer D A scope statement or scope management plan

RAJ DAHIYA
par RAJ DAHIYA , Project Manager - Energy Optimization , Siemens

Option C : Create W.B.S.

Irina Chepel
par Irina Chepel , Personal trainer , Freelancer

Third answer

Muhammad samran
par Muhammad samran , Junior Officer/Project Coordinator , Pakistan Stell Mill

The best answer is C.

Mohamed Hamdy Kamal Riad
par Mohamed Hamdy Kamal Riad , Senior Solution Architect , IBM

Create Work Breakdown Structure

LABIB KOOLI
par LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)

The best way is to creat a WBS, option C.

Ibrahim Hussein Mayaleh
par Ibrahim Hussein Mayaleh , Sales & Business Consultant and Trainer , Self-employed

(c) Create a WBS that groups project components that defines the whole project scope