Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

The execution progress of your project has been found to be too slow. Which measure is most likely to immediately speed up the project?

 A  Technical training for all team members  B  Daily phone conferences and detailed reporting  C  A team meeting at a location convenient to all team members  D  Collocation of team members at a suitable place

user-image
Question ajoutée par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
Date de publication: 2015/01/17
Mohamed Galal Hussein Ahmed Mohamed
par Mohamed Galal Hussein Ahmed Mohamed , Technical Mnager , Fast Building Contracting Co.

I agree with Mr. Dahiya ; D

Irina Chepel
par Irina Chepel , Personal trainer , Freelancer

Fourth answer D.

Alex Al Yazouri
par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

That's the best answer

D  Collocation of team members at a suitable place

Ibrahim Hussein Mayaleh
par Ibrahim Hussein Mayaleh , Sales & Business Consultant and Trainer , Self-employed

The first three are actually loosing the valuable time in the critical situation. I'll go with (D)

RAJ DAHIYA
par RAJ DAHIYA , Project Manager - Energy Optimization , Siemens

 D.  Collocation of team members at a suitable place

Utilisateur supprimé
par Utilisateur supprimé

Thanks for the invite

  D Collocation of team members at a suitable place

Answers wonderful friends

 

 

LABIB KOOLI
par LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)

Yeah as it is an urgent measure may lead to change 

Agree with you all 

Waqas Raza Khan
par Waqas Raza Khan , Accountant , Cold Store Group of Saudi Arabia

Option D is best Answer

USAMA YOSSRY AHMED GENDIA
par USAMA YOSSRY AHMED GENDIA , Resident Engineer , ACE ARAB CONSULANT ENGINEER - MOHARM BAKHOOM

I Useall of the above in addition to the follow-up field with daily reports and reports as well as weekly and monthly

Utilisateur supprimé
par Utilisateur supprimé

Option  D

   Collocation of team members at a suitable place means setting objectives for each team member. As far as possible, these objective such be SMART - Specific Measurable Achievable Resourced Timed.

More Questions Like This