Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

In FMEA studies, how to calculate the RPN ?

RPN : Risk Priority Number 

For each failure mode we calculate the RPN 

Pick up the correct choice 

 

A. RPN= Likelihood of Occurrence 

B. RNP= Likelihood of Occurrence × Likelihood of Detection 

C. RNP=Likelihood of Occurrence × Likelihood of Detection × Severity

user-image
Question ajoutée par LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)
Date de publication: 2015/01/31
Saiful Islam Hiron
par Saiful Islam Hiron , Site HR Manager , Handicap International

Agree with Tartir...........................

The right answer is Choice (C) RNP=Likelihood of Occurrence × Likelihood of Detection × Severity

Utilisateur supprimé
par Utilisateur supprimé

Agreed with  experts

It's  C 

Vinod Jetley
par Vinod Jetley , Assistant General Manager , State Bank of India

Calculation of the Risk Priority Number

The system calculates the risk priority number for each potential defect of a function as follows:

It chooses the effect with the greatest significance B (highest number of points in valuation).

It chooses the cause with the greatest probability of occurrence A (highest number of points in valuation).

If one or more detection actions are assigned to the defect cause, the system chooses the highest probability of detection E (lowest number if points in valuation) from all the assigned detection actions that have at least the status Confirmed .

The risk priority number results as follows: RPN = B * A * E.

 

Mohamed Hamdy Kamal Riad
par Mohamed Hamdy Kamal Riad , Senior Solution Architect , IBM

3rd Answer                                                                                                     

C

جعفر هندي زين السقاف
par جعفر هندي زين السقاف , "Certified trainer by the Yemeni Engineers Syndicate." , Engineers Syndicate

Answer is option "c " RPN = O × D × S

Elke Woofter
par Elke Woofter , Project Assistant , American Technical Associates

 In FMEA normally we'll calcualte the RPN as Sev x Occ x Det

C. RNP=Likelihood of Occurrence × Likelihood of Detection × Severity

Utilisateur supprimé
par Utilisateur supprimé

Yeah, it's 'C'. Product of all three.

As Saleh
par As Saleh , Recruitment Manager , Saudi House Recruitment

I think my choice and that of the development of the possibilities that are less risk

B. RNP = Likelihood of Occurrence × Likelihood of Detection

 

VENKITARAMAN KRISHNA MOORTHY VRINDAVAN
par VENKITARAMAN KRISHNA MOORTHY VRINDAVAN , Project Execution Manager & Accounts Manager , ALI INTERNATIONAL TRADING EST.

answer option >>>>>>>>>>>>>>C. RNP=Likelihood of Occurrence × Likelihood of Detection × Severity

Utilisateur supprimé
par Utilisateur supprimé

B sounds like the correct answer.