Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
1200 Firing days this is for GE frame6 gas turbine.
there is formula for this which have many factor. check the manufacturing for the gas turbine. these factor are:
* firing hours
* count of trips
* stop/start count
* type of the fuel rich or lean
*
in these days owner can eliminate the CI and go directly to HGPI then major which will save down time. This can be done by upgrading the liner and TP to new design and material.
Combustion8000 fired hours for gas and distillate
Hot gas path24000 fired hours gas or16000 fired hours distillate
major48000 fired hours gas or32000 fired hours distillate
for MS3002