Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
all - a&b&c&D
........................................................
B and C is the answer as it can be considered as internal quality defect and can be much saved maximum wastage where as compared to external which is the stage where we can say it is at distributor and customer end
which will give the quality defect cost maximum and reliability will be lost
By checking carefully project site requirement before issued to particular production area
The correct answer is Option
My answer is option b) ...................
Option B at the time of receiving materials and then Option C during work in progress.
if waste is detected and rectified during these2 stages, the other two wont be required.