a. process costing
b. ABC
c. Job order costing
d. life-cycle costing
Answer option (d) >>>>>>>>>>>>>>> life-cycle costing
Option d>>> Agree with Mr. Venkitaraman
absolutly life cycle costing since it involve the intire process
the costing system that could work best is the life-cycle costing
d. life-cycle costing, Cost will be absorbed in all stages including the R&D costs.