How to manage the obsolescence of equipments and systems in LNG industry?

user-image
Question ajoutée par Salah LAIB , Electrical maintenance engineer , sonatrach petroleum corporation (spc)
Date de publication: 2015/04/07
Nicholas Wilson
par Nicholas Wilson , Installation Electrician , Doosan Babcock Power Systems UK

As obsolescence is inevitable, a systematic management approach must be employed, similar to that of a PPM schedule for any piece of equipment. Such as system should include current equipment status reviews, alternative and/or design reviews, hardware reviews and possible overhaul of current equipment.

By having such a strategy in place, you are able to control the issue of obsolescence as opposed to succumbing to it.