Select appropriate generator
Proper foundation
Install the generator
Cabling and make their Msyrkabl
Providing appropriate panel
Electrical connections are made
Commissioning and testing
In all cases, the standards should be considered
There is a minimum standard followed by all engineers in the installation of a back-up power source. But this is a minimum requirement, therefore, the engineer will have to make his own design and decision according to the specific site's requirement. He needs to consider the following; the location, site condition, loading condition, acoustic consideration, etc.. You may also refer to NFPA 110, it will provide you more information about back-up power installation guidelines.