Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
Activity based costing (ABC) assigns manufacturing overhead costs to products in a more logical manner than the traditional approach of simply allocating costs on the basis of machine hours. Activity based costing first assigns costs to the activities that are the real cause of the overhead.