Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

Why sequencing study of construction activities is impotent?

user-image
Question ajoutée par Osman Guni , STRUCTURAL ENGINEER , BUREAU VERITAS (BAN) PVT LTD
Date de publication: 2013/08/02
oman faruq
par oman faruq , Jr. Engineer, Feasibility Study and Detail Design (FSDD) Under SSWRDSP & PSSWRSP of LGED. , Bets Consultants Ltd.

1.A good construction sequence will allow for as many overlapping activities as possible, without causing safety problems.2.Method statements allow for the most economical way of working to be identified.
They can be prose or tabular and can include health and safety provisions that are required.3.Precedence diagrams are one of the best tools for preparing construction programmes, as they allow for very complex relationships to be easily incorporated.4.Regardless of how programmes are prepared, they are virtually always presented as bar charts, and computer programs are used extensively to prepare these programmes.

Osman Guni
par Osman Guni , STRUCTURAL ENGINEER , BUREAU VERITAS (BAN) PVT LTD

Sequence studies enable building programmes to be produced that are effective as tools of control during construction works, and provide the most efficient method of working.

Bhavin Mehta CCP(CCE), PMP
par Bhavin Mehta CCP(CCE), PMP , Assistant Manager , Larsen and Toubro Ltd

Simple: it serves as a route map to achieve project objectives.

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?