a. It should not be used with process or job costing.
b. It can be used only with process costing.
c. It can be used only with job costing.
d. It can be used with either process or job costing.
correct answer is d. It can be used with either process or job costing..
d-is the correct answer I mean Activity -Based Costing can be used with either process or job costing.
(d)It can be used with either process or job costing
Answer D is the correct option with either .