Register now or log in to join your professional community.
a. reduce production costs.
b. reduce the optimal lot size.
c. reduce the time required to introduce new products.
d. All of the above are correct.
I think that all the3 first questions are correct
My answer is an option (D) All of the above are correct
Experts are right in the naswers
d. All of the above are correct.
a) it will not reduce Production Cost; (Production Cost: Raw materials and labor) has noting to do with computer design
b) It will not reduce optimal lot size: ( lot size: A measure or quantity increment acceptable to or specified by the party offering to buy or sell) has noting to do with computer design
c) it will reduce the time required to introduce new products.
All Of Above All Options Should Be Collect
all of the above are correct...................................
reduce the time required to introduce new products.
(D) Thank You.
d. All of the above are correct. .............................................................................