If proposal cost is increasing high - how to reduce it?

user-image
Question ajoutée par Muhammad Sohail , Principal Engineer , BUILDCON Consulting Engineers
Date de publication: 2015/06/18
Selvarajah Jeyaraj
par Selvarajah Jeyaraj , Estimator QS , INC Group

Reduce the quantity through value management.

Rony Amara
par Rony Amara , Senior Structural Engineer , Mimar Emirates Engineering

the question it self is unclear any how a value engineering process should be part of design discipline from early design stage

Abdunasser Mohamed
par Abdunasser Mohamed , started with field engineer up to technical manager , IONICS /GE/ BIWATER/AL MASSA WATER TREATMENT

try to use better idea and your experience for alternatives with out reducing quality  

SAI ANIMESH KUMAR N
par SAI ANIMESH KUMAR N , Senior Manager, Credit , Ahli United Bank

I accept with the said answer. 'Value Engineering' is the key.

Amer Mardini
par Amer Mardini , Project Manager , Al Bandary Engineering

If Value Engineering is allowed, this will be the1st solution, if not then either by finding alternative sources/ suppliers with lowers prices, reducing the indirect cost, reducing the overhead fees.

Akil Gai
par Akil Gai , Manager - Civil , BASF Chemicals India Pvt. Ltd.

Value engineering is definitely the first option but also need to work on Man power planning by optimizing the resources and using the best available talents.

Jonel Battung
par Jonel Battung , Site Engineer

Optimize your design. Plan it carefully by using good design softwares. Use alternative design procedures like ASD, LRFD and if possible use Plastic design for steel structures if the client is okay with it.

nazeer shaik
par nazeer shaik , Senior engineer , Petrofac international ltd

Re-check the design margins and utilize the full strength of structure and optimize the quantities. 

Structural Engineers can tell you if it is possible to reduce proposal costs.

 

Paul Clint Plandano
par Paul Clint Plandano , Gen.Plumber , Kingdom of Saudi Arabia

Review first the project plans and quantities based on Program of Works, And shop drawings then colect and select to minimized/ Adjust the bill of material's used and re-design/ re-construct the project proposal, if needed

Imran Muhammad
par Imran Muhammad , Proprietor , Galaxy Stationers & Print

There are many areas from where we can control and reduce the cost.

1- Micro programming to identify the cost reducing points.

2- Better programming which contain cost reducing data.

3- Try to control stoppages or delays, which normally comes in normal practices.

4- Use of GMP or best operational techniques.

5- Reducing of workable time to save Labour and energy costs.

6- Availability of Labour and equipments on time.

7- Try to use modern techniques and machinery.

8- Use of continual improvement.

but remeber not to compromise on quality and standards commited to a client.