Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

How do I transfer Material from plant to plant through SAP System ?

user-image
Question ajoutée par YOUSEF ASHOUR , Fleet Administration Officer , Almarai Company
Date de publication: 2015/07/30
Mohamed Irfan -CISCP/CISCM
par Mohamed Irfan -CISCP/CISCM , Director of Supply Chain , FWTT

Yes use  MB1B command to transfer plant to plant  ..........                   ........                         ...... 

Shabbir Nazir
par Shabbir Nazir , Raw Material Store Supervisor , Nippon Paint Pakistan

we can transfer material from plant to plant though sap system by using the command (mb1b) then enter material slip # , doc.header tex , movement type , plant code , reason for movement then storage location press enter and give Rcvg SLoc.

Manendra Kumar Mishra
par Manendra Kumar Mishra , Tenure , Robert Bosch Engineering and Business Solutions Ltd

We have to use MB1B (Transfer Posting) for transferring posting

There are1 step and two step procedure for stock transfer.

In1 step the stock removal and stock posting will be done by using1 movement type.

In2 step procedure,stock removal and stock posting will be done by using2 movement types.

Before doing MB1b make sure that the material is available in both the plants

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?