Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What is the interaction activities between the QC and QA engineers?

user-image
Question ajoutée par Abdelrahim farah , Sr.Production engineer , Abdullah Hashim industerial gases and equipment co. LTD
Date de publication: 2015/08/14
Reynald Ryan Galila
par Reynald Ryan Galila , Safety Engineer , GNQ INDUSTRIAL AND CONTRACTING INCORPORATED

Quality Assurance is more process driven. This means that there are a set list of procedures that help to maintain a high level of quality. If followed, theses procedures eliminate unnecessary mistakes before making something. Quality Control can best be explained as capturing defects and non-conformance before they get used or shipped. This is often done by testing (FAT = Factory Acceptance Test) or measuring by quality control personnel to make sure items are with in specified tolerances (on a machined part, for example).

So, in short, Quality Assurance is geared to catching mistakes before they happen.Quality Control is catching them after they happen and before they get to the client or end user. I hope to clarify their individual activities. 

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?