Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
First of all you have to study the topographic location , the soil investigation report is giving you idea of the type of the soil and the permeability factor which is the main factor for designing the
de-watering system
normally in the high depths starting from.0 meters and more its recommended to go to the deep well system especially if you have high ratio of permeability factor, otherwise we have to go to well points system.