Get approved HVAC Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Project Engineer.
Ensure the HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by Inspection department prior to installation
Ensure sufficient hand tools, power tools, ladder and scaffolding are available for installation
Coordinate with other discipline and ensure site clearance is available to start the HVAC Activities
Arrange the sufficient manpower such as Supervisor, Foreman, Duct fitter, pipe fitter, Assistant duct and pipe fitter etc.., and ensure all of them attended safety orientation and having proper PPE’s prior start installation activities at site
Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor (or) Foreman and inform them to shift the required ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.
Prior to start HVAC activities notify to QC Personal for surveillance to ensure the quality work
To maintain safe all construction HVAC and Chilled water piping activities are carried out in accordance with the Company’s safety policies and procedures; ensure that appropriate safety and protective equipment is used by Company & Contractor staff.
Closely monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specification and get daily progress report from site supervisor (or) foreman and update to project Engineer (or) Manager
Preparing relevant documents to conduct inspection for completed installation activities and raise RFI to QC-Inspector (To ensure that any activity offered for inspection has an attachment of IFC drawing, method statement (if required), Inspection & Test Plan (ITP) followed by check list)
Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standard
Preparing the relevant documents to Conduct Testing inspection such as Duct light testing for Ducts and Hydro test for Above ground and Underground chilled water piping’s, systems.
Active involvement in weekly meetings with the Project management & QC Supervisor and manager to resolve the site related issues.
Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s.
Assist the Commissioning Team on Testing, Adjusting & Balancing (TAB) stages of the Air and Hydronic Piping’s.
. Assist the Project Engineer during Preparation of final Test Reports, as built drawings, Operation & Maintenance manual and handing over the project to client
1-Site supervision.
2-Site Work Inspection as per approved shop drawing
3-Material inspection as per approved material submittal
4-Work Follow up as per approved progress
5-Daily progress report.
6-FOR and NCR of complete Mechanical works
Review the design
verify the load calculations
check the shop drawings
check the material submittal
check the method statement for installation
check the site work and material delivery
testing commissioning with approved vendors
as built drawings ans O&M Manual
see on daily motion interview of Engineers
1. Coordinating Duct/Pipe routing with site conditions & other services.
2. placing correct order for duct fabrication.
3. maintaining quality checks for installation
4. leading & improving skills of team of Sub-ordinate Supervisors/foreman
SITE SUPERVISING OF WORKRES
MATERIAL INSPECTION
DAILY PROGRESS REPORT
thumb rule
drawings
working according to drawings
material availabilty for work
work done report for the work
good knlowdge and uderstandind of hvac shop drawings as duct system and P&IDs. is the main key responsibilities of hvac engineer.
Accuracy, strong vision, examining problems and providing solutions
To ensure the site work is executed inline with approved shop drawings, technical specifications within the schedule.
1. Firstly they take the safety measures
2. celearence on site
3.Work permit for using any fabrication Work on site
Example: welding works through which the chances tom get fire and Ect.
4.Inspection of meterial as per the BOQ
5.Quatity should not Exceed the BOQ
6.Regularly meetings with client and reporting to the project Coordinator or Concern Depertament
7.Taking care of our tools and materials.
finally they are so many things but its depend on type of project and all..