Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

Indicate which of the following statements is not correct?

a) Both a job order and a process cost system track

the same three manufacturing cost elements—

direct materials, direct labor, and manufacturing

overhead.

b) A job order cost system uses only one work in

process account, whereas a process cost system

uses multiple work in process accounts.

c) Manufacturing costs are accumulated the same

way in a job order and in a process cost system.

d) Manufacturing costs are assigned the same way

in a job order and in a process cost system.

user-image
Question ajoutée par Utilisateur supprimé
Date de publication: 2015/12/09
هيثم ناجى
par هيثم ناجى , محاسب اول , الفيوم لصناعة السكر

i think D is correct answer

 Manufacturing costs are accumulated the same

way in a job order and in a process cost system.

More Questions Like This