Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

هل المهندس من واجباته التنفيذ فقط للمخططات الخاصة بالمشاريع ام يجب عليه ان يعدل عليها ويجعل التصميم الاساسي اقل تكلفة كنوعاً من الابتكار ؟

user-image
Question ajoutée par Alaa U'ddin Khalil , مهندس مشاريع ومناقصات , أرابتك
Date de publication: 2015/12/26
mohamed elkadi
par mohamed elkadi , مدير موقع ومكتب فني , التنمية المصرية الجزائرية

Yes, the Engineer must make the implementation less costly material and time to serve the interests of the parties to work after their approval

mohamed habbiche
par mohamed habbiche , عون امن , الامن الوطني

نعم يجب على المندس الاجتهاد في مجاله كاابتكار طرق تجعل التصميم اقل تكلة و اكثر احترافية و تطورا 

ABDURRAOUF AMER BUHAMA BUHAMA
par ABDURRAOUF AMER BUHAMA BUHAMA , مكتب هندسي استشاري , الجدارة للاستشارت الهندسية

 

Study and review the drawings before starting to implement and can modify the Omrasla designed to be studied --- and his attempt to have the best and cheapest ways to implement high quality

Mohammad Abdelqader Alfar
par Mohammad Abdelqader Alfar , Head of Department , German Jordanian University

It is implied in the question that we are talking about a construction engineer who works for the contractor - the executive party. As long as the engineer abides by the specifications and drawings that are part of the contractual documents, it is absolutely valid and commended to find less costly solutions. This is considered efficiency and the profit of the contractor should increase especially if the contract is  lump sum. However, he should be careful not to change any requirement or specification or detail that is required by the contract and his solutions should be efficient time-wise. Since he is an engineer and not a foremen, he can be critical and propose alternatives or variations to the consultant in some certain situations. But unless he receives an official approval he cannot change any predetermined requirement. 

Ahmed Nour
par Ahmed Nour , Project Manager, Senior , UNITED FOR ELECTRICAL CONSTRUCTION

No, if we find a low cost way and achieve the same goal, you should present it to the top managers, such as the project manager.

mohammad atif atif
par mohammad atif atif , MEP Manager , Sanjose Construction

being an engineer we should follow the project specification. if there is better solution then old design and it is fimiliar with project specification and regulation then only we can propose or amend alternative solution.   

Ali Ahmed Elmorsy
par Ali Ahmed Elmorsy , مدير صيانة , Flexografia

Of course, the engineer must look at the design with the engineer's eye. Perhaps it was a wonderful design that he took and executed, and it may have some flaws. He must review his superior before the amendment. If the amendment is approved, modify that design to another that suits the quality and cost standards.

سامح عبدالمنجى ابراهيم علوانى عائلة عوض ( عرب بنى خويلد / الاشراف)
par سامح عبدالمنجى ابراهيم علوانى عائلة عوض ( عرب بنى خويلد / الاشراف) , منسق عام انشطة/ مدير تنفيدة , الصندوق المصرى السويسرى للتنمية /هيئة الاغاثة الكاثوليكية الامريكية

المنوط بة عملة فقط  وفى حالة وجود اى تعديل او ابتكار ييد المشروع فعلية ابلاغ الجهة المنوط بها ذلك مع الشرح واخذ الموافقة منهم

Utilisateur supprimé
par Utilisateur supprimé

يمكن للمهندس رفع توصياته ومقترحاته للمالك أوالإستشاري بإجراء تعديلات بما فيه مصلحة العمل والمالك

Utilisateur supprimé
par Utilisateur supprimé

نعم اذا كانت الفكرة جيدة واقتصادي توثر بشكا ايجابي على مشروع

Bashir Al-asady
par Bashir Al-asady , Project Development Manager , QIMAT AL-EQTIDAR ENGINEERING COMPANY

يجب على المهندس الالتزام بتنفيذ النطاق وتنفيذ خطة ادارة المشروع والبرامج بدقة اما عند التنفيذ وقد وجد ما يتطلب احداث تغيير لصالح العمل فعلية ان يتبع السياق لاحداث هذا التغيير بعد استحصال موافقة جميع الاطراف المعنية .

 