How is the procurement and project's time schedule?

Procurement and Project's Time Schedule, would it be a good idea to synchronize procurement operations with work progress at site, or just finish all the required materials purchase operation at the beginning of the project.

user-image
Question added by Amin ALMASRI , Procurement Manager , Dur Hospitality Co.
Date Posted: 2016/01/17
Nadeem Asghar
by Nadeem Asghar , Supply Chain Consultant/Trainer , Independent Practitioner

It is always a good and I would say the most appropriate strategy to arrange for procurement and delivery of the material as and when these are required. In view of procurement processing time, production lag and various unexpected snags we may keep a safe cushion in terms of time but this would obviously increase inventory holding costs and is not viewed favorably in the industry. 

Raman Mukunda Nhattuketty
by Raman Mukunda Nhattuketty , Team Leader - Procurement & Logistics , AL ROSTAMANI GROUP, DUBAI

It is better to synchronize procurement operations with work progress at site

Elias Amin Badra
by Elias Amin Badra , Managing Partner , HELLENIX - INDUSTRIAL RELATIONS ADVISORS, Greece

The project's plan should layout the procurement and the time frame for each element and task. Invest time to plan, determine the dimensions, communicate the requirements in a timely manner,  your suppliers should become your associates. Suppliers ought to synchronize themselves with your requirements, you ought to assess their capacity, their failure is also yours. (sorry but it is a fact)

Early planning helps you budget, research and negotiate effectively and efficiently.

If you plan ahead you are in control, but if you don't then everyone else become in control except for yourself.

Remember to draw a contingency plan with a relevant cost provision.

Draw your overall plan first and then plan to synchronize. 

Md Fazlur Rahman
by Md Fazlur Rahman , Procurement Specialist , Engineering and Planning Consultants Ltd

Procurement actions and delivery of goods must match with Project's Time schedule for successful completion of project

Rogelio Hagarap
by Rogelio Hagarap , Construction Piping Engineer , Fluor Daniel Inc. / Fluor Mideast Ltd.

In every project that I handle, the very important role is procurement, specially time table or schedule becuase the longer schedule the more money consume. Shor schedule but finish the project.

Mohamed Fekry
by Mohamed Fekry , Construction Project Manager , Project Build Co.

Dividing the project from day one into stages depending on the complexity of the project ofcourse will help to produce a suitable time schedule step by step which produces procurement plans and arrange the delivery operations with work progress

Santosh Menon
by Santosh Menon , Manager Projects-MEPI , Oman Shapoorji LLc

Timely Procurement will assist Project timely Completion.

رشيد بلحية
by رشيد بلحية , رسام طبوغرافي , الشركة الوطنية للجيوفيزياء E.NA.GEO

Procurement precedes the project and is after good planning

Maher Abuelteen
by Maher Abuelteen , Sr. Resident Engineer - Buildings, Roads and Infrastructures , Al-Darwish Engineering - Qatar

You need to consider and plan earlier for all long lead items which are the materials that need between 3 to 6 months to be on-site. This is a key factor to succeed in comletion your project on-time and within the planned budget. For the materials that are available most time in the local market such as steel, cement, concrete, pipes, bitumen, etc., you can follow your normal Procurement Plan e.g. order the materials as per the construction schedule as needed. 

I also would like to emhance the importance of the ahead planning for unexpected risks/unforseen events such as the diplomatic problems/siege/boycott as what happened recently in the GCC Countries. We must be well-prepared and ahead planned in purchasing all critical material to be able to complete our project on-time.

Project time is all over the time and procurement time means testing time.

Subramanyam NV
by Subramanyam NV , Head of Operations , Reliance Retail Limited

It all depends on the type of project, if the project is a small and timelines are minimal then it is advisable to have all the procurement of material at the beginning itself. If one is dealing with large industrial, infrastructure projects then, a realistic estimate with a time-bound work-flow will only help any investors. 