Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
it is a way to design production systems to minimize waste of materials, time, and effort in order to generate the maximum possible amount of value
The word Lean came from Toyota ( Japanese ) as there are the one who started this and very successful in implementation of lean concepts.
Japanese also call them as "MUDA" which is also know as waste.
There are 7 major wastes identified which are listed below.wormpit
This can be remembered by word "WORM-PIT" & U.
Definiation of LEAN
“A systematic approach to define VALUE, identifying and eliminating WASTE, bringing PREDICTABILITY & CERTAINITY in WORKFLOW through PULL Planning and achieve PERFECTION through continuous improvement.
Lean Construction is an integration of Construction based research and Design, right from start to end of the project and various phases of works involved in it. Lean Construction and its practices will lead to the increase in productivity, speed of the construction project and along with that, this concept will make the projects more cost effective. It is adaptable to all phases of project like, Planning, Designing, Execution.