Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
Delivery of concrete mix through trans-mixers during hot weather is an important issue to be controlled. How to control a low temperature of concrete, how to control slump, how to control flow-ability, and how to control its strength depending on the aforementioned?
by adding chilled water to the mixer during concrete production,by keeping the temperature of the aggregates low by fogging and covering,by covering the transit mixer drums by hessian cloth and keeping them moist
actually the problem with casting concrete in hot weather is that increasing the rate of hydration, thermal stress, the attendcy for drying shrinkage cracking, permability and decresea long term strength.
but there sre many stratiges to avoid that such as ;
1. water- reducing admixture is usfuel to improve workability.
2. retarding admixture is usful to reduce slump loss and incease setting time.
3. mineral admixture is also useful to reduce loss of workability and increase seetting time.
4. using ice as a part of mixing water quantity.
5.cool aggreagate by shading aggregate stockpiles from sun
The contanierized flake ice plan wth antomatic control system can make it realized.More could contact with me.Skype:gangcheung
using shelter for concrete coarse part
using wet borlap covered around concrete mixer trucks
using a chiller to control the water temprature
using an automatic batching plant to check the weather humidity in order to avoid adding more water to concrete when the humidity is very high and it can affect the water cement ratio
using some admixtures including micro cilis and supreplastisizers
The best way adding Fly-ash20-25% and chilled water otherwise it will make critical situation. More ever we have to cover the Hessian Cloth on Transit mixer drum and every time spry the water while loading the Concrete.
Store the all aggregate and sand should be covered mete colour roof with spry of water as per the the code
Agreed with hassan amer ali algaifi and Mahendra Ghorpade
ice ice baby
Using chilled water while mixing and mixing the concerete are the best ways to control temperature
70 to 75 % of the mix consist of Aggregates . if it is managed to stock under shade
and a relatively cool place then for sure the temperature of the concrete will be low.
moreover using ice and cold water in concrete is common in gulf.