Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What is the most important characteristics of the work breakdown structure?

What is the most important characteristics of the work breakdown structure?

 

user-image
Question ajoutée par مهرداد کتامی پور- مهرداد محمد جواد , Project Planner Manager , Omrab Engineering Co
Date de publication: 2016/02/08
Ahmed abdalla PMP MBA
par Ahmed abdalla PMP MBA , Head of Project Management Office (PMO)&Planning Unit , Strategic Group

Include all the major deliverables of the scope of works in the project  along with the required approvals from the stakeholders

Utilisateur supprimé
par Utilisateur supprimé

The most important characteristic of WBS is the ability to display and effectively communicate the entire project in a very concise manner and in a mutually agreed basis of all the parties involved. The structure can always be tailored to the suitability of the project, depending on the type of the project, or the interest of entities involved.

 

Clearness, reduction in complexity and should cover each and every goal

Niyamad Sherif
par Niyamad Sherif , Tool and Die Maker & Machinist , Minami Metals Pvt Ltd

Hii Work break down structure and planning always go hands to hands. For successful achievement of both contract and corporate goals, a plan is needed that specifies all attempts to be made assign responsibility to particularly specified organizational components and develops budgets & schedules for the achievement of the work. The program manager has the responsibility of preparing this plan with the assistance by the program team assigned in accordance directives of program management system. Before the initiation of the contractual efforts, the detailed planning is also developed in accordance with the budgeting policy of the company. In the light of the above considerations, the project manager must develop the Work Breakdown Structure (WBS) while planning particular project. The work is structured into small components that are Independent, or with least interfacing with and dependence on other continuing components Manageable, therein particular authority and responsibility can be assigned Integrate able so that entire package can be viewed Measurable in terms of progress

KIRITKUMAR SHANKERLAL  PATEL
par KIRITKUMAR SHANKERLAL PATEL , GENERAL MANAGER , SHETH CONSTRUCTION COMPANY

Sudden Natural Hazards & Missing in calcualtion

Christian Ramos
par Christian Ramos , Rollout Manager , Nokia

D. assures all work is identified

More Questions Like This