In a hybrid system with RES how to operate the generating set when the power of the photovoltaic field does not cover all of the required power?

(the power of the photovoltaic field is not zero to boot the transfer switch)

RES: renewable energy sources

user-image
Question ajoutée par Utilisateur supprimé
Date de publication: 2016/02/25
Waqas Anjum
par Waqas Anjum , Power Expert , Confidential

Dear Zouari

 

Good day.

If you are using cyclic batteries and have a good battery backup then you can set the battery DoD (depth of discharge) percentage value to start the generator. in this case, when solar is not providing much current then batteries will start discharge to powering the actual load and at defined DoD value the controller will give signal to ON the generator.

 

in other case you can also set and follow the voltage to start the generator.

 

If you have any question you may contact at

 

Regards