Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What are the efficient methods to move heavy and bulky MEP equipment to its final location in the construction site and up/down levels?

user-image
Question ajoutée par Moataz El Sheikh , D. Technical Manager , MAG-Holding
Date de publication: 2016/03/14
Mohammed  Faisal
par Mohammed Faisal , Asst.Mechanical Engineer. , Goldenline center airconditioning llc.

As the equipments had reached the site,either it to placed on the roof top or in the floor level based to it roof top unit can be placed by chain pulley or by the transformer machines available on site.

More Questions Like This