1. desired output divided by the daily operating time 2. daily operating time divided by the product of desired output and the sum of job times 3. the product of desired output and the sum of job times divided by daily operating time 4. daily operating time divided by the desired output
The time is from the beginning to the end of your process, as defined by you and your customer. This is calculated in 8 Hrs duty time and the Daily operating time divided by the scheduled output in that day.
The Answer for the above should be
daily operating time divided by the desired output
Daily operating time Divided by the Scheduled output
Hello Team,
Daily operating time divided by the scheduled output
Regards,
Saiyid
Cycle time is computed as: Daily operating time divided by the scheduled output.
daily operating time divided by the product of desired output and the sum of job times______________________________________________________A
Cycle time is the total time from the beginning to the end of your process, as defined by you and your customer. Cycle time includes process time, during which a unit is acted upon to bring it closer to an output, and delay time, during which a unit of work is spent waiting to take the next action.
Answer 4 matches for cycle time calculation
I don't agree with option 4 as answer since, available operating time divided by desired output is TAKT Time.
Hence Cycle time is Total operating time avl divided by the product of desired output and the sum of job times. Hence option 2 is right answer