How can we achieve extra productivity/miles with small product cost?

1. Using well systematic system.

2. Put extra pressure to worker.

3. Indicate minimum productivity target to the staff.

4. Hire experience with good educated worker.

5. non of above.

user-image
Question ajoutée par Prabin Rai , inventory officer , bijaya motor
Date de publication: 2016/03/18
Wasi Rahman Sheikh
par Wasi Rahman Sheikh , WAREHOUSE SUPERVISOR , AL MUTLAQ FURNITURE MFG

My answer is Using well systematic system.

Amir Imtiaz
par Amir Imtiaz ,  Weaving Mills of 300 Air Jet Weaving Machine.  Denim Mills (24 Rope Indigo Dye Demin Fabric Mills)

 

1 & 4. but basically we must understand the process, materials, time, manpower requirements. this is classic example of lean manufacturing based management.

Create standard work, identify waste from the process (there are 7 types of waste in any manufacturing / service industry prioress) apply lean six sigma or Kaizen approach and fix the gaps for most productive process on sustainable basis.

 

Rustan Manalo
par Rustan Manalo , SUPERVISOR , ALMISNED JOINERY

USING WELL SYSTEMATIC SYSTEM

More Questions Like This