How to get best installation of instrument that the customers Like?

user-image
Question ajoutée par Ahmed Abdul-Halim , Biomedical engineering manager , Global Vision
Date de publication: 2016/04/05
Elmer Angeles
par Elmer Angeles , Mechanical Commissioning Supervisor / Engineer , Kellogg Brown & Root

When it comes for best instrument installation on a certain equipment's, the contractor should follow vendors guidelines. There is always a procedures to follow on how to install, most especially on a critical and sensitive piece of equipment like Cryogenic Exchangers and Cryogenic Pumps. The best thing to do prior to the installation of instruments to the equipment is to properly coordinate with the vendors or client to avoid damages, repair and repetition of work. 

ahmed abd elhamed
par ahmed abd elhamed , مدير مصنع الزوى , الشركه العربيه وبوليفارا

Follow the engineering drawing

ziad safa
par ziad safa , PMO-Project Manager , Salehiya

starting from initiating phase through planning phase and getting the approval documents needed from supplier and costumer and then insure the standard installation process to the client 

Sharafat Ali
par Sharafat Ali , Electronics Technician , Panasonic Avionics Corporation

using our best expertise we can install the required equipment.

Edgar Barrozo
par Edgar Barrozo , Senior Mechanical Engineer . , Amana Contracting and Steel Buildings

The costumer can get the best instrument installation by dealing with the correct and reliable, expert ,ISO certified company or certified technician to get the job done. 

 

Muhammad Umar Qutab
par Muhammad Umar Qutab , interface engineer , PDO

1. According to Standard Hookup Drawing set for the project

2. refer to international standard that client is using  for Engineering

Erel Atilano
par Erel Atilano , Engineering Manager , Bifco Foods LLC

First it depends on what kind of instrument. In general instrument each either perpendicular or parallel to the ground. It must accessible for reading, cleaning and repair or replacement.  Away from hazards that my cause malfunction and damage the instrument. 

Othmane BEN BELLA
par Othmane BEN BELLA , Réparation des équipements électroménager et travaux divers , Sté KHADAMAT AGA FROID

Hi every body.

I think you sould follow the contructions guid at first, then communicat with the costumer to choise best inslallation of the equipement in the best palce and the right way.

Finaly the cleaned and finished work always impressive for costumers :)

MOHAMED MOSTAFA
par MOHAMED MOSTAFA , Senior Broadcasting Engineer , ROTANA International Media Group

you need to listen to the custmer requirments at first so due to the equipments which you have and by calculating the power consumption for every device then you can install it .

Radhey Shyam Singh
par Radhey Shyam Singh , L&T Hydrocarbon Engineering

As per project spec make Method statment for installation sequence and prepare proper mainpower equipment stable area for jack lifting equipment etc.

Cristian Florin Dascalu
par Cristian Florin Dascalu , IMG Executive (IT / Software) , Wipro Technologies

you must install the best solution for the customer and explain to them why is it the best solution